Plan Status: #425 was successful
Build: #387 was successful
Code Changes
Code has been updated by David Marginian.
-
David Marginian
Remove poms.
- /dwr/trunk/pom.xml (version 3772)
Plan Status: #425 was successful
Code has been updated by David Marginian.
Remove poms.
Powered by a free Atlassian Bamboo open source license for DWR. Try Bamboo - The Zen of Continuous Integration.
Continuous integration powered by Atlassian Bamboo version 3.0.1 build 2302 -