Plan Status: #425 was successful
Build: #378 was successful
Code Changes
Code has been updated by David Marginian.
-
David Marginian
Fix pom
- /dwr/trunk/build.xml (version 3758)
Plan Status: #425 was successful
Code has been updated by David Marginian.
Fix pom
Powered by a free Atlassian Bamboo open source license for DWR. Try Bamboo - The Zen of Continuous Integration.
Continuous integration powered by Atlassian Bamboo version 3.0.1 build 2302 -